follow us: @_EalingNews
call us: 07488 352 974
email us: news@ealing.news

Tunnel Boring Machine Anne has lift off!

High speed rail network HS2 has said it has completed a set of lifts of tunnel boring machine (TBM) components at its Victoria Road Crossover Box site at north Acton.

The final major lift, of the middle shield of the TBM named Anne, was completed on Friday evening (17/11/2023) with the lights of Wembley Stadium arch in the background.

Click here to see a video of what happened on the night.

The 336 tonne component was lifted using a 750 tonne crane into the caterpillar shaped crossover box.

HS2 said the TBMs will be used to dig the eastern half of the Northolt Tunnel – which will eventually be used to take the new high-speed line between Old Oak Common station and outer London.

They will complete a 3.4-mile stretch of the tunnel from Victoria Road to Greenford, beginning their journeys early in 2024.

Are you an Ealing resident with a story to share? Or spotted something we should know about?
Get in touch with us by emailing: news@ealing.news or contact us on X @_EalingNews

SUBSCRIBE FOR FREE TO THE EALING.NEWS NEWSLETTER

GET OUR GREAT NEWS, FEATURES, REVIEWS AND MORE DIRECT TO YOUR INBOX

SUPPORT JOURNALISM IN EALING

LATEST EALING.NEWS UPDATES

MORE FROM EALING.NEWS